Combining space-efficient FocalPoint Biofiltration and Rain Guardian Pretreatment to meet TSS and TP requirements.

Ferguson Waterworks helps navigate stringent stormwater regulations using the FocalPoint BioFiltration System and Rain Guardian Pretreatment. This two-pronged approach met the 80% Total Suspended Solids (TSS) and 50% Total Phosphorus (TP) removal requirements for redevelopment projects in Chelmsford, Massachusetts.
What challenges did the FocalPoint Biofiltration and Rain Guardian Pretreatment Systems solve?
Due to nearby wetlands and the potential for high groundwater, the project required a low-profile and effective TP treatment device. In addition, the stormwater system needed to fit within a limited footprint.
FocalPoint was utilized to meet the required TSS and TP performance criteria in a cost-effective manner. Meanwhile, Rain Guardian captured sediment, debris, and other pollutants before they reached the biofiltration system. Finally, downstream R-Tank Stormwater Modules provided subsurface detention, peak flow attenuation, and flood protection.
What are the benefits of combining a high-performance biofiltration system with curbline pretreatment?
Pairing Rain Guardian curbline pretreatment with high-performance biofiltration creates a more efficient treatment train—capturing sediment and debris upstream while the biofiltration system targets finer pollutants like TSS and TP. As a result, this approach supports stronger treatment performance, reduces maintenance, and increases both system efficiency and longevity.
Ferguson Waterworks is a smart partner who understands local regulations, tight timelines, and strict budgets. We work directly with your team and local governments to meet and exceed stormwater requirements. Contact us today for start-to-finish support.
View Similar Case Studies
In order to revitalize and meet stormwater codes, the abandoned parking area at the Shoppes at Fashion Square in Orlando, FL, required updates. With a permeable paving system and machine technology, we helped the client achieve their goals, save $1 million, and complete the project in just 10 days.
With solar panels in place and operational, an immediate and effective erosion control solution was imperative. Especially considering the panels were positioned next to channels, drip lines, and spillways.
After failed attempts to stabilize the earth at the Mt. Jackson Solar Farm, they required an immediate, cost-effective erosion control solution. Ferguson Waterworks was brought on board to address their ongoing concerns.