Browse the case studies listed below.
Explore real-life challenges faced by trade professionals and contractors across a range of industries, and learn how Ferguson Waterworks facilitated solutions to help them achieve success.
Blossom Park experienced drainage challenges. Learn how our team of stormwater product professionals created a durable, low-maintenance, and aesthetically pleasing concrete drainage channel using HydroTurf and High-Performance Turf Reinforcement Mats.
The town of Clayton, North Carolina upgraded 19,5000 commercial and residential electric and water meters with the Sensus Advanced Metering Infrastructure (AMI) system for streamlined and precise utility management.
Ferguson Waterworks supplies smart water meters to Faulkey Gully municipal utility district for better leak detection and billing accuracy.
Strategically placed floating wetlands substantially reduce phosphorous and nitrogen in local lake - improving water quality, enhancing recreational activities, and discouraging algae blooms
Learn how biotic soil amendments re-established vegetation in Silverton, Colorado - a retired mining site turned recreational area
Ferguson Waterworks saves a customer roughly $648k using innovative and proven geotextile solutions.
After several attempts to stabilize the area surrounding the Grand Boulevard Park channel, the City of Nichols Hills partners with the experts at Ferguson Waterworks for long-term and aesthetically pleasing channel stabilization solutions.
ERTC Lots 16-18 are nested on a hillside with existing utilities complicating the stormwater drainage system - Ferguson Waterworks keeps the project on track with stackable R-Tank Stormwater Modules which offer both storage and subsurface drainage for slopes.
A parking expansion project at a VA Medical Center in Texas requires additional stormwater detention. Looking for professional recommendations, they contact Ferguson Waterworks.
Our New Initiatives Division develops a Civil Infrastructure Modeling (CIM) project execution plan with VDC services to create 3D modeling - saving our client in construction delays, reducing rework and change orders, streamlining material selection with better cost control, and optimizing supply chain visibility.
Our precision reality-capture, BIM, cloud data analysis, and dedicated project management delivered precise pipe modeling for the wastewater treatment plant upgrade.
When it comes to complex projects like constructing a new 44 MGF water treatment facility, the Ferguson Waterworks in-house Virtual Design and Construction team provides a clear path to project success. We help consolidate all the components into one resource using VDC software and tools.