Case Studies

Browse the case studies listed below.

Explore real-life challenges faced by trade professionals and contractors across a range of industries, and learn how Ferguson Waterworks facilitated solutions to help them achieve success.


The City of Rock Hill is the fifth most populous city in South Carolina with 75,000 utility residents. After the Lead and Copper Rule Revisions (LCRR) and a series of EPA mandates, the municipality needed to conduct over 30,000 field visits, totaling nearly $7.5 million. Ferguson Waterworks reduced required lead pipe field inspections by 97% using VODA.ai LeadZero technology! In total, saving the City of Rock Hill $7M.

Stacked black pipe for water and sewer infrastructure.

The Ferguson Waterworks infrastructure project management team facilitates new water and sewer services that span more than 400 acres. Our expertise, value engineering, and product procurement saved the client $25M and six months of lead time.

Ferguson Waterworks provides revegetation solutions for USFS in order to help re-establish depleted soils after Colorado's wildfires.

Beemat floating wetland pots

A student at NC State University studies the impact of strategically placing Beemats Floating Wetlands to reduce algae blooms and excess nutrients

Products: Beemats
Case studies - this Focalpoint biofiltration system met stormwater requirements and maximized parking spaces

FocalPoint increases available parking at a new medical center with visually appealing solutions that meet stormwater requirements

Case studies involving focal point bioretention systems

Learn how a micro-bioretention stormwater system qualified for a grant by serving as both stormwater management and an interactive educational tool.

Brand new All Saints Episcopal Day School Sports field.

Ferguson Waterworks teams up with Frontier Golf to stop rainfall events from making the All Saints’ Episcopal Day School sports field unusable. Furthermore, meeting Phoenix drainage capture and conveyance guidelines with R-Tank stormwater retention modules.

Learn why the Hampton Roads Sanitation District partnered with Ferguson Waterworks for HDPE Line Replacement Project Management and supply solutions during their plant decommission project that required replacement of a 9,000 ft sewer main.

Helicopter hydroseeding in West Virginia

When an upcoming seeding project is met with limited access and steep terrain, they turn to Ferguson Waterworks for smart hydroseeding solutions.

IMPA Solar Park Revegetation Gallery 1

To revitalize the depleted, sandy soils at a new solar site, Ferguson Waterworks consulted with partner Profile® Products to analyze the soil and create a custom solution.

Pipes in a water treatment plant

Ferguson Waterworks' VDC Services support the De Soto Water Treatment Plant Improvement project with dedicated experts, 3D modeling technology, streamlined material procurement, and more.

Pipeline construction worker stading next to large black pipe and referencing design plans on a tablet.

Ferguson Waterworks Supply Chain Procurement Specialists support a revolutionary potable reuse project, coordinating resources across fire protection, commercial plumbing, process mechanical, and utility trades.

ferguson waterworks podcast pusher hero

The Flow Of Innovation Podcast

Listen to Ferguson Waterworks’ podcast as we discuss industry innovations and break down complex topics like utility technology, stormwater management, and non-revenue water solutions.

Start Your Project Today